In the field of large-scale engineering, saving 1% of costs equals earning millions of profits, but traditional stone construction is like a "bottomless pit" - grassroots treatment, labor overspending, rework and maintenance Invisible losses erode project profits.
Today, taking JustOne flexible stone as an example, we will reveal how to use material revolution to save millions of profits in engineering projects!
The 'cost black hole' of traditional stone construction
1. Grassroots treatment devours profits
Concrete leveling: 8-12 yuan/㎡ (labor)+15-20 yuan/㎡ (materials)
Hanging net reinforcement: Double the processing fee for curved/irregular structures
Construction period loss: 15 days for leveling every 10000 square meters, delaying subsequent processes
2. Uncontrolled labor costs
Senior bricklayers start at 800 yuan per day and require 3 people to work together
Complex shapes require hiring external stone carvers, with a daily cost exceeding 2000 yuan
The rework rate is as high as 18% (problems such as hollowing and cracking)
3. Hidden cost superposition
Heavy equipment entry fee, noise penalty, construction waste removal fee ..
JustOne's' Cost Reduction Formula 'for Flexible Stones
▎ Direct wall installation technology: Base treatment fee reduced by 80% directly
✅ Adaptive base surface: ± 3cm height difference directly covers without leveling
✅ Renovation of old surfaces: Ceramic tiles, coatings, and stone substrates can be directly pasted without removal
✅ Zero heavy equipment: saving rental costs for cranes and cutting machines
Project background
A 5A level office building in Shenzhen, with a curtain wall area of 23000 square meters, was originally designed with dry hanging stone and a total budget of 6.87 million yuan.
pain spot
The building load exceeds the standard and requires reinforcement of the steel structure, with an estimated cost increase of 2.06 million yuan
The processing fee for curved curtain wall stone is as high as 950000 yuan
Noise control prevents construction at night, resulting in a 32 day extension of the project timeline
JustOne Flexible Stone Solution
Load reduction: With a surface density of only 8kg/m ², structural reinforcement is cancelled, saving 2.06 million yuan
Surface direct pasting: on-site cutting of irregular units, saving 950000 yuan in processing fees
Silent construction: 24-hour shift operation, reducing the construction period by 28 days
Final cost
Traditional plan: 9.87 million yuan (including reinforcement fee)
Flexible stone scheme: 5.74 million yuan
Directly save 4.13 million yuan and reduce costs by 42%
JustOne flexible stone - turn every penny saved into your competitive advantage!