Please leave a message

FIND GLOBAL PARTNERS

Please leave a message

All Categories
×

Get in touch

State Grid exclusive jutone flexible stone patch proofing: 3 days to obtain customized solution

2025-08-12 15:26:00
State Grid exclusive jutone flexible stone patch proofing: 3 days to obtain customized solution

Powering critical infrastructure demands precision. Justone partners with State Grid to deliver certified flexible stone solutions for substations, control centers, and utility buildings.

Your Exclusive Advantage:
⚡️ 72-Hour Custom Proofing: Project-specific mockups (fire-rated/anti-static options available)
⚡️ Seismic Resilience: 12mm flexible stone withstands structural vibration (Tested to GB 50011)
⚡️ Non-Conductive Safety: 100% quartz stone – zero electromagnetic interference risk
⚡️ Maintenance Revolution: Cement-free adhesive & UV-shielded surface – 20+ year service life

浙江电网打样收尾2.jpg

Technical Validation Kit Includes:
• Custom-sized StoneFlex panels (300x600mm)
• GB/T 23451-2009 compliant test reports
• Non-alkaline adhesive samples
• Thermal cycling (-30°C to 80°C) data sheets

“Engineered for critical infrastructure: Cut installation time by 60% while meeting GB 50222 fire safety standards.”

Request State Grid Priority Proofing
→ Dedicated technical team ←

Contact Us - Hangzhou Justone new material Co., LTD.

Table of Contents

    +86 18758015184
    +86 18758015184
    [email protected]