Home / Blog / Industry News / How to Install JUSTONE Flexible Stone on Metal Sandwich Panels

How to Install JUSTONE Flexible Stone on Metal Sandwich Panels

Update: 23 Oct 2026

Quick Answer

JUSTONE Flexible Stone can be installed on a suitable metal sandwich-panel face using a three-step system: first apply a compatible epoxy primer; next use Justone's special bonding adhesive to fill the panel grooves and create a flat plane; then use the same specified adhesive to bond the JUSTONE Flexible Stone panels. The metal face must be stable, dry, clean, free of rust and contaminants, and verified for coating compatibility before installation.

The adhesive is not an interchangeable commodity in this assembly. Justone specifies its own bonding adhesive because, after curing, it retains flexibility and elongation that help accommodate service movement caused by temperature change. Product-specific technical data, curing conditions, mock-up results, joints and the panel manufacturer's requirements must still be confirmed for each project.

Why Does Installing JUSTONE Flexible Stone on a Metal Sandwich Panel Need a Specific System?

A metal sandwich panel is different from concrete or cement mortar. Its outer metal skin may contain a factory coating, profiling grooves and local fasteners, and it expands and contracts as temperature changes. The cladding build-up therefore has to do more than simply "stick stone to metal." It must establish adhesion to the actual panel finish, create a continuous flat plane and remain compatible with expected panel movement.

The three layers serve different functions:

Layer Primary function Main site control
Epoxy primer Prepare and seal the metal face, support adhesion and help protect exposed metal from corrosion Confirm compatibility with the existing factory coating and follow surface-preparation requirements
Justone bonding adhesive as leveling layer Fill panel grooves and create a flat receiving plane Apply within the permitted thickness and allow it to cure as specified
Justone bonding adhesive as fixing layer Bond the JUSTONE Flexible Stone panel to the prepared surface Use the specified trowel, coverage, open time and curing conditions

Justone's public installation guidance identifies steel plates and exterior cladding panels as applicable substrates and notes that different substrates require dedicated primers. It also specifies the use of special adhesive for flexible-stone installation.

What Must Be Checked Before Work Starts?

Do not apply primer or adhesive until the project team has approved the actual sandwich-panel surface.

Inspect the metal face

Check that the outer sheet is structurally stable and securely fixed. Record:

  • metal type and factory coating;
  • panel profile and groove depth;
  • scratches, exposed metal and corrosion;
  • oil, release agents, dust or site contamination;
  • loose, chalking or peeling coating;
  • panel joints, fasteners, trims, flashings and drainage paths;
  • expected service temperature and solar exposure.

A primer cannot compensate for loose rust, oil or a failing factory finish. AMPP notes that structural-steel primers support corrosion protection and provide a better surface for subsequent coatings, while primer selection depends on surface preparation, service environment and required life.

Confirm system compatibility

Before full installation, obtain written confirmation for:

  1. the epoxy primer and the actual metal or coil coating;
  2. the primer and Justone bonding adhesive;
  3. the maximum groove-filling thickness per application;
  4. the required cure time before the next layer;
  5. the adhesive coverage, open time and temperature range;
  6. movement-joint and panel-joint treatment;
  7. the sandwich-panel manufacturer's warranty conditions.

Build a representative mock-up

Use the actual sandwich panel, primer, adhesive, JUSTONE Flexible Stone SKU and joint details. The mock-up should include at least one groove, panel joint, fastener zone and edge detail. Allow the complete system to cure before checking adhesion, flatness, panel alignment and appearance.

Where the project specification requires a quantitative adhesion check, use the agreed pull-off method and acceptance criterion. ASTM D4541 covers pull-off strength evaluation of coating systems from metal substrates, but the project team must define whether and how that method applies to this complete cladding build-up.

Step 1: Apply Epoxy Primer to the Metal Sandwich Panel

Prepare the metal face according to the approved primer technical data sheet. Remove dust, oil, release agents, loose coating and corrosion products. Repair deep scratches and exposed metal using the panel or coating manufacturer's approved method before priming.

Apply the compatible epoxy primer evenly and allow it to cure under the specified temperature and humidity conditions. In this assembly, the primer is used for four practical purposes:

  1. Corrosion and rust protection: it helps protect properly prepared exposed metal from environmental attack.
  2. Improved adhesion: it creates a compatible receiving surface for the adhesive system.
  3. Substrate sealing: it helps provide a more uniform interface over the prepared metal face.
  4. Compatibility with the following alkaline layer: where the adhesive or leveling material is alkaline, use a primer specifically approved to isolate and remain compatible with that layer.

The fourth point should not be presented as a universal property of every epoxy primer. The selected primer must be approved for the actual sandwich-panel coating and the Justone adhesive.

Site checks after priming

Before moving to Step 2, confirm that:

  • the primer is continuous and has no missed areas;
  • no contamination settled on the wet film;
  • the required cure or recoat window has been reached;
  • adhesion to the existing panel finish is acceptable;
  • panel joints, drainage routes and required movement zones remain visible and have not been bridged unintentionally.

Step 2: Level the Grooves with Justone's Special Bonding Adhesive

Metal sandwich panels are commonly profiled rather than flat. JUSTONE Flexible Stone should not be bonded over deep, unsupported grooves without an approved leveling detail.

Use Justone's special bonding adhesive to fill the grooves and create a flat, continuous receiving plane. Apply the material within the product's permitted thickness. If a groove is deeper than the approved single-pass thickness, use the manufacturer-approved multi-layer method or an alternative backing detail rather than applying an uncontrolled thick layer.

Use a straightedge to check the plane in both directions. Allow the leveling layer to cure as stated in the technical data sheet before applying the fixing layer.

Why is leveling important?

A properly leveled substrate helps:

  • provide more uniform adhesive contact behind each JUSTONE Flexible Stone panel;
  • reduce local voids over the metal ribs and grooves;
  • control panel alignment and joint width;
  • improve the finished appearance under raking light;
  • prevent the wall profile from telegraphing through the thin veneer.

Do not fill over functional panel joints, flashings, weep routes or details that must remain capable of movement or drainage.

Step 3: Fix the JUSTONE Flexible Stone Panels with Justone's Special Bonding Adhesive

Once the leveling layer has cured and the surface is clean, flat and approved, apply Justone's special bonding adhesive using the specified notched trowel. Work within the published open time and install the JUSTONE Flexible Stone panels in the approved sequence.

Justone's general installation guidance recommends applying the special adhesive to the substrate with a V-notched trowel and installing the flexible stone from top to bottom. Press the panel evenly to achieve the required contact without trapping large voids.

During installation:

  • follow the approved layout and datum lines;
  • observe adhesive open time and skinning;
  • maintain the specified joint width;
  • keep adhesive off the finished face;
  • treat corners, edges and penetrations according to the approved details;
  • preserve sandwich-panel and building movement joints through the finish;
  • use the approved jointing material rather than rigidly locking moving interfaces.

Why Must Justone's Specified Bonding Adhesive Be Used?

The primer, leveling layer, fixing layer and JUSTONE Flexible Stone panel operate as one assembly. Substituting an unapproved adhesive changes the adhesion, flexibility, curing, water response and movement behavior of that assembly.

Justone specifies its special bonding adhesive because the cured adhesive remains flexible and has high elongation, helping the system accommodate movement associated with thermal expansion and temperature changes. This is especially relevant on metal skins, which respond quickly to solar heating and cooling.

However, flexibility does not eliminate the need for movement joints or good panel design. The final detailing must account for:

  • sandwich-panel joint locations;
  • facade dimensions and orientation;
  • metal-skin temperature range;
  • fasteners and support movement;
  • corners, openings and penetrations;
  • joint-sealant compatibility;
  • wind, moisture and fire requirements.

For project submittals, attach the current adhesive technical data sheet and supporting test evidence for elongation, adhesion, water resistance and service-temperature range. Do not rely only on a generic "flexible adhesive" description.

What Installation Errors Should Contractors Avoid?

Error Why it creates risk Correct approach
Priming over rust, oil or dust The system bonds to contamination rather than sound metal or coating Clean, repair and prepare the face before priming
Assuming every factory coating accepts epoxy Coil coatings vary in chemistry and surface energy Verify compatibility and complete a mock-up
Filling deep grooves in one uncontrolled pass Thick adhesive may cure unevenly, shrink or exceed its approved use Follow the maximum build or approved multi-layer detail
Bonding JUSTONE Flexible Stone directly across panel joints Metal-panel movement may concentrate stress in the finish Carry required movement joints through the cladding
Replacing the specified adhesive Changes assembly performance and may invalidate technical support Use the approved Justone adhesive system
Installing before the leveling layer cures Traps moisture and disturbs the plane Observe stated cure and recoat times
Treating the primer as a rust converter Active corrosion can continue beneath the assembly Remove and repair corrosion as specified before coating

What Should Be Included in the Project Submittal?

A professional submittal for JUSTONE Flexible Stone over metal sandwich panels should include:

  • JUSTONE Flexible Stone product data and selected SKU;
  • sandwich-panel manufacturer and factory-coating type;
  • epoxy-primer technical data and compatibility approval;
  • Justone bonding-adhesive technical data;
  • allowable leveling thickness and cure schedule;
  • panel layout and joint plan;
  • corner, edge, opening and flashing details;
  • treatment of sandwich-panel movement joints;
  • mock-up approval record;
  • agreed adhesion test method and acceptance criterion, if required;
  • installation temperature and weather limits;
  • cleaning and maintenance instructions;
  • product- and assembly-specific fire documentation required by the project.

Frequently Asked Questions

Can JUSTONE Flexible Stone be installed directly on metal sandwich panels?

It can be installed on a suitable, stable metal-panel face through an approved primer, leveling and adhesive system. Direct bonding without confirming the panel coating, surface preparation and groove detail is not recommended.

Why is epoxy primer applied first?

A compatible epoxy primer helps protect properly prepared exposed metal from corrosion, improves the interface for the following layer and seals the prepared face. Its compatibility with the factory coating and Justone adhesive must be confirmed.

Can the primer be applied over rust?

No. Rust, loose coating and contamination must be removed or repaired in accordance with the approved surface-preparation method. Primer should not be treated as a substitute for corrosion removal.

Why are the grooves filled before JUSTONE Flexible Stone is fixed?

Leveling creates a flat and continuous receiving plane, improving adhesive contact, panel alignment and the appearance of the thin finish.

Can another tile or stone adhesive be used?

Only an adhesive approved by Justone for this assembly should be used. A substitution changes the assembly's adhesion, flexibility, curing and movement behavior and should undergo written technical review and mock-up testing.

Does flexible adhesive replace movement joints?

No. Flexible adhesive helps accommodate service movement, but required panel, facade and building movement joints must remain functional and be detailed through the finish.

How long should each layer cure?

Follow the current primer and adhesive technical data sheets. Cure time depends on product formulation, applied thickness, temperature, humidity and ventilation; it should not be guessed from a generic schedule.

Should an adhesion test be completed?

A representative mock-up is recommended. Where the project specification requires a measured test, agree the test method, substrate condition, cure time and acceptance value before work starts.

Conclusion

Installing JUSTONE Flexible Stone on metal sandwich panels is a controlled three-step process: prime the prepared metal face, level the panel grooves with Justone's special bonding adhesive, and use that specified adhesive again to fix the JUSTONE Flexible Stone panels.

The key is to treat primer, adhesive and veneer as one compatible system. Good results depend on clean and stable metal, approved product compatibility, a flat receiving plane, correct curing and movement-joint detailing, not on adhesive strength alone.

For a project-specific method statement, provide Justone with the sandwich-panel manufacturer, factory-coating type, panel profile, groove depth, elevation drawings, service climate and selected JUSTONE Flexible Stone SKU.

Sources

  1. Justone, Construction Method / Applicable Base Surfaces / Procedures: https://www.neosoftstone.com/constructionadvantages/
  2. Justone, FAQ: https://www.neosoftstone.com/faq/
  3. AMPP, Introduction to Structural Steel Primer Selection: https://www.ampp.org/technical-research/what-is-corrosion/protective-coatings-learning-center/introduction-to-structural-steel-primer-selection
  4. Sandwich Panel Technical Information, Best Practices with Sandwich Panels: Protection Against Corrosion: https://panelsandwich.org/en/sandwich-panel-technical-information/05-best-practices/
  5. ASTM, D4541 Standard Test Method for Pull-Off Strength of Coatings Using Portable Adhesion Testers: https://www.astm.org/Standards/D4541.htm
Recommended Products
{config.cms_name}
As a trusted supplier to numerous partners worldwide, we look forward to working with you.
Backed by an experienced team of technical experts, we provide professional guidance and effective solutions to complex technical challenges.